Production technology
The construction
behind the ball.
Choose the manufacturing route around intended use, material, performance requirements and market positioning.
Three manufacturing routes.
| Process | Construction approach | Discuss for your project |
|---|---|---|
| Thermal bonding | Heat and pressure bond the panels. | Match and training programs with specified water-resistance and shape requirements. |
| Machine stitching | Panels are joined with machine stitching. | Training, school, club and promotional programs. |
| Hand bonding | Skilled workers position and bond the panels. | Premium customized football development. |
Production workflow
From materials to finished products.
Material & panel preparation
Confirm covers, backing layers, bladder route and panel geometry.
Printing & graphics
Work from approved colors, graphic placement and artwork.
Assembly & forming
Use the selected process, then complete forming and finishing.
Inspection & packing
Check the product against the confirmed reference before packing.
A complete construction
More than a surface material.
01
Cover & surface
PU or microfiber options and different textures can be discussed.
02
Layers & support
Intermediate layers and overall construction depend on the product route.
03
Bladder & behavior
Select the bladder with air retention, rebound and intended use in mind.
OEM & ODM
Let’s build your next ball.
Tell us your market, your product requirements and your brand direction.